Friday - 21 November 2008
Published: 08 May 2006 08:58 AM
Source: The Engineer
The first trip of the Great Eastern from her moorings at Deptford to this place was not intended for a trial trip, and cannot be called a trial trip in any way save three particulars - and in these only to a limited extent.
First, the facility with which she minds her helm; secondly, the character and working of her machinery; and thirdly, the strength of her structure.
With the exception of the positively unsafe features, appearances and results were very satisfactory; but they were neither unexpected nor, reasoning from experience, unprecedented.
The whole affair is also a timely commentary on the prevalent fashion of sacrificing engineering completeness for the purpose of hurrying on commercial results.
| Bookmark with: |
| Job Title | Job Location | Job Position |
|---|---|---|
| Procurement Specialist – Buyer,... | Somerset | Permanent |
| Avionics Systems Engineer... | South West | Permanent |
| Senior Marine Engineer - Plymouth... | Devon | Permanent |
| Railway Fitter - Electrical /... | London | Permanent |
| Naval Architects - Marine Defence -... | Devon | Permanent |
| Naval Architects - Marine Defence -... | Devon | Permanent |